Govt targets 4500 MWp of net-metering based solar installations by 2025

The government, as part of its efforts to meet future energy needs, is targeting 1000 Mega Watt peak (MWp) of net-metering based solar installations by 2020-21 and 4500 MWp by 2025.

Published in Business Recorder, 7th November, 2017

https://www.brecorder.com/2017/11/07/379520/govt-targets-4500-mwp-of-net-metering-based-solar-installations-by-2025/